PERFORMANCE

 

In the case of larger quantities of steam, the possibility exists to connect multiple Talbot STP-plants in parallel.

With pressure differences larger than 2.0 bar, the pressure will either first be reduced to the working pressure with a pressure reducing valve or two or more Talbot STP-plants can be connected in series.

 

The weight of a Talbot STP-plant, depending on the size, amounts to between 2 and 3 tons  with a floor space requirement of approximately 100 cm x 250 cm and a height of 200 cm.

 

DELIVERY PERIOD

The delivery period for a Talbot STP-plant averages around 10 to 12 weeks. Integration and commissioning normally takes place within a working week.

 

INSTALLATION, COMMISSIONING, SERVICE AND MAINTENCANCE

Installation, commissioning, service and maintenance take place through experienced and specialised energy technology and plant construction companies. If required by the customer, Talbot New Energy Limited will act as a general contractor and take responsibility for the complete installation and commissioning.